Industrial Heating Plant

Steam & Heating
Boilers

Full lifecycle solutions for steam and heating boiler plant — supply, installation, design and integration for hospitals (sterilisation & laundry), food processing, manufacturing and industrial sites.

Industrial steam boiler plant

Core Capabilities

propane_tank

Steam Boiler Supply & Install

Fire-tube and water-tube steam boilers sized for sterilisation, laundry, process heating and central plant requirements.

architecture

Boiler Plant Design & Integration

Complete plant design — from feed-water treatment and blowdown to steam distribution and condensate return — integrated with existing utilities.

  • checkPressure-vessel certified
  • checkSAQCC Gas registered
Boiler plant pipework and gauges

Fuel Systems

Multi-fuel boiler ranges burning LPG, natural gas or diesel — with conversion paths between fuels as cost and availability shift.

LPG · NG · DIESEL Fuel options
SANS 347 Pressure equipment
verified

Compliance & Safety Inspections

Pressure-equipment regulation (PER) compliance, statutory inspections and boiler upgrades to bring legacy plant back into spec.

Book a Compliance Audit

Typical Applications

local_hospital

Hospitals

Steam for autoclave sterilisation, central laundry and kitchen plant in public and private healthcare facilities.

restaurant

Food Processing

Process steam for cooking, pasteurisation, cleaning-in-place (CIP) and bottling lines for food & beverage producers.

factory

Industrial Plants

Process heat for chemical plants, mining and heavy industry — sized from 500 kg/h up to multi-MW plants.

precision_manufacturing

Manufacturing

Reliable steam and heating supply for FMCG manufacturing plants — with fuel-conversion and upgrade paths as plants scale.

Discuss Your Plant

Engineering Standards

Category Specification Standard / Compliance
Boiler Type Fire-tube & water-tube steam boilers SANS 347 / PED 2014/68/EU
Fuel Source LPG, natural gas or diesel (multi-fuel) SANS 10087-1 gas installation
Capacity 500 kg/h — 10 t/h steam plant Sized to peak process demand
Pressure Rating Up to 10 bar (g) saturated steam Pressure Equipment Regulations (PER)
Water Treatment Feed-water softening & deaeration BS 2486 boiler-water chemistry
Inspections Statutory pressure-vessel inspections OHS Act regulations 9 & 10

Deployment Workflow

01 Phase One

Plant Audit

Demand profiling, fuel-cost analysis and condition assessment of any existing boiler infrastructure.

02 Phase Two

Plant Design

Boiler sizing, fuel selection, distribution routing and integration with sterilisation, laundry or process loads.

03 Phase Three

Install & Integrate

Plant-room installation, steam piping, condensate return and integration with feed-water treatment and BMS.

04 Final Phase

Commission & Certify

Pressure testing, statutory inspections and Certificate of Compliance issuance for operational handover.

Plan Your Boiler Plant Upgrade

From new builds to refurbishments and fuel conversions — our SAQCC-registered team handles design, supply, installation, commissioning and statutory compliance.